Alpha acted as Construction Manager and designated General Contractor for the completion of 3 Stadia (out of 5 in Trinidad & Tobago) for the hosting of the FIFA Under 17 Women’s World Cup Final. The works were to be completed in two (2) weeks in order to host the World Cup games at these venues.…
Read more
MIC TECHNOLOGY CENTRE – TOBAGO
Alpha as the Main Contractor constructed a 2-Storey MIC Technology Centre Building in (Tobago) for a period of eleven (11) months for Phase I, IA, II & III. The capacity of the building was 46,000 sq. ft. Services also included Engineering, design and construction for Roads, Water, Sewer and Underground Utility Infrastructure as well as…
Read more
MIC PENAL WORKFORCE ASSESSMENT & TECHNOLOGY CENTRE
Full construction of 3 New Buildings with capacity of 30,000 sq.ft. Scope includes all concrete works, structural steel framing, and roofing with associated building services installation.
Read more
ARTHUR LOK JACK GRADUATE SCHOOL OF BUSINESS – PROPOSED EXTENSION
Construction of a 30, 000 sq. ft. 2-Storeyed Extension and Associated External Works. Construction of the structure includes reinforced concrete foundations, structural steel framing, reinforced concrete floors, staircases, blockwalls and glazed walls, office partitioning, gypsum ceilings, carpet and tiled floors. Services include Electrical, AC, Elevator, Fire Protection and Plumbing Facilities.
Read more
FIRST CLASS LOUNGE & INTERNATIONAL DEPARTURES HALL, CHECK IN/ARRIVALS HALL MODIFICATIONS AT THE ANR ROBINSON INTERNATIONAL AIRPORT
The renovation and modification of the existing terminal building at the ANR Robinson International Airport.
Read more
- 1
- 2