MIC TECHNOLOGY CENTRE - TOBAGO (PHASE - I, II, III)
- Client:MIC TECHNOLOGY CENTRE (MIC)
- Location:#79 MILFORD ROAD TOBAGO
- Completion Date :AUGUST 2011
- Info :
Alpha as the Main Contractor constructed a 2-Storey MIC Technology Centre Building in (Tobago) for a period of eleven (11) months for Phase I, IA, II & III. The capacity of the building was 46,000 sq. ft.
Services also included Engineering, design and construction for Roads, Water, Sewer and Underground Utility Infrastructure as well as the Design of Waste Stabilization Ponds and a Detail Design of the Drainage System(s).